Agape Assisted Living
              Garden Manor

            Construction Progress Photos

 

                     September, 2007

 

  September, 2007

Storefront doors installed at
building entrances.

 

 September, 2007
 Food prep room sink and cabinetry.
 

  September, 2007

Unit doors and hardware installed.

 

 September, 2007
 Typical unit bathroom sink with cabinetry.
 

  September, 2007
   Typical unit bathroom light with exhaust fan.
 

 September, 2007

Thermostat for breezeway installed.

 

 September, 2007
  Emergency lighting, Fire horn and strobe,
  fire alarm and alarm panel.
 

  September, 2007

Exit signs qnd emergency light
installed at end of North corridor.

 

 September, 2007
  Fire extinguisher housing installed.
 

 September, 2007
 Grab bars in unit bathrooms installed.
 

 September, 2007
 Janitor sink installed.
 

 September, 2007
 Light and sprinkler at closet.
 

 September, 2007
 PTAC louvered doors installed.
 

 September, 2007
 Public toilet with paper towel
  and trash receptacle.
 
 

              March, 2007  April/May, 2007   June, 2007   July, 2007   Aug, 2007   Sep, 2007

 