Coventry Crossing |
|
Construction Progress Photos |
| |
|
June/July, 2008 |
| |
|
 |
June/July, 2008 |
|
6-9-2008
Back side of building one. | |
|
| |
|
 |
June/July, 2008 |
|
6-9-2008
F D C connecting on the back
side of the buildings. | |
|
| |
|
|
 |
June/July, 2008 |
|
6-9-2008
Dumpster enclosure behind building one. | |
|
| |
|
 |
June/July, 2008 |
|
6-9-2008 Fire hydrant next to main driveway. | |
|
| |
|
 |
June/July, 2008 |
|
6-9-2008 Left end of building one. | |
|
| |
|
 |
June/July, 2008 |
|
6-9-2008 Masonry going on dumpster
pad behind building two. | |
|
| |
|
 |
June/July, 2008 |
|
6-9-2008 Masonry going on on dumpster
pad behind building one. | |
|
| |
|
 |
June/July, 2008 |
|
6-9-2008 Right front corner of building one. | |
|
| |
|
 |
June/July, 2008 |
|
6-9-2008 Running water line down Farrow Parkway. | |
|
| |
|
 |
June/July, 2008 |
|
6-9-2008 Transformer Pad. | |
|
| |
|
 |
June/July, 2008 |
|
6-9-2008 Walk between both building. | |
|
| |
|
|
|
|
|
|
|
 |
June/July, 2008 |
|
6-12-2008
Duct and curb for exhaust fan. | |
|
| |
|
 |
June/July, 2008 |
|
6-10-2008 Water tie-in. | |
|
| |
|
 |
June/July, 2008 |
|
6-12-2008 Gas line. | |
|
| |
|
 |
June/July, 2008 |
|
6-12-2008 Restroom exhaust fan. | |
|
| |
|
 |
June/July, 2008 |
|
6-12-2008 Restroom framing on building one. | |
|
| |
|
 |
June/July, 2008 |
|
6-12-2008 Riser room. | |
|
| |
|
 |
June/July, 2008 |
|
6-12-2008 Unit A-2. | |
|
| |
|
 |
June/July, 2008 |
|
6-12-2008 Unit A-7. | |
|
| |
|
 |
June/July, 2008 |
|
6-12-2008 Unit B-7. | |
|
| |
|
 |
June/July, 2008 |
|
6-12-2008 Wall rough-in for water cooler. | |
| |
|
 |
June/July, 2008 |
|
6-12-2008 Restroom framing on building two. | |
| |
|
 |
June/July, 2008 |
|
6-16-2008 Grease tramp on the right side of
building two. | |
| |
|
 |
June/July, 2008 |
|
6-16-2008 Grease trap in front of building one. | |
| |
|
 |
June/July, 2008 |
|
6-16-2008 Man hole in front of building one. | |
| |
|
 |
June/July, 2008 |
|
6-16-2008 Man hole in front of building two. | |
| |
|
 |
June/July, 2008 |
|
6-12-2008 Unit B-7. | |
| |
|
 |
June/July, 2008 |
|
6-16-2008 Running sewer line in front of building
one. | |
| |
|
 |
June/July, 2008 |
|
6-16-2008 Sewer line in front of building two. | |
| |
|
|
 |
June/July, 2008 |
|
6-18-2008
Dens Glass on the back side of
building one. | |
|
| |
|
 |
June/July, 2008 |
|
6-18-2008
Finish plywood on building two. | |
|
| |
|
 |
June/July, 2008 |
|
6-19-2008 Forming up curb and gutter
on the back side of the building. | |
| |
|
 |
June/July, 2008 |
|
6-19-2008 Grease trap for unit A-1 tie-in. | |
| |
|
 |
June/July, 2008 |
|
6-19-2008 Grease trap for unit B-6 tie-in. | |
| |
|
 |
June/July, 2008 |
|
6-19-2008 Left side of building two. | |
| |
|
 |
June/July, 2008 |
|
6-19-2008 Running plywood and dens glass on
building one right side. | |
| |
|
 |
June/July, 2008 |
|
6-20-2008 Masonry on building two. | |
| |
|
 |
June/July, 2008 |
|
6-20-2008 Wall ties on building two. | |
| |
|
 |
June/July, 2008 |
|
6-21-2008 Masonry complete on dumpster pad behind
building one. | |
| |
|
 |
June/July, 2008 |
|
6-21-2008 Roof on building two. | |
| |
|
 |
June/July, 2008 |
|
6-21-2008 Tower on building two. | |
| |
|
 |
June/July, 2008 |
|
6-26-2008 Screen wall for electrical panels. | |
| |
|
 |
June/July, 2008 |
|
6-30-2008 Running conduit to transformer. | |
| |
|
 |
June/July, 2008 |
|
6-19-2008
Exterior framing on building one. | |
|
| |
|
|
|
|