  August, 2008

8-11-2008
Slab ready with poly and wire ready for pour.

 

  August, 2008

8-12-2008
Concrete being loaded into pump truck.

 

  August, 2008

8-12-2008
Pump truck in place ready for pour.

 

  August, 2008

8-12-2008
Concrete building pad being placed.

 

  August, 2008

8-12-2008
Concrete being placed.

 

  August, 2008

8-14-2008
Hollow Metal door frames being set.

 

  August, 2008

8-14-2008
CMU walls being laid up.

 