8-11-2008 Slab ready with poly and wire ready for pour.
8-12-2008 Concrete being loaded into pump truck.
8-12-2008 Pump truck in place ready for pour.
8-12-2008 Concrete building pad being placed.
8-12-2008 Concrete being placed.
8-14-2008 Hollow Metal door frames being set.
8-14-2008 CMU walls being laid up.