Low Country Foodbank

            Construction Progress Photos

 

                      June/July, 2008

 

  June/July, 2008

6-9-2008 Back side of building one.

 

  June/July, 2008

6-9-2008 F D C connecting on the back side of the buildings.

 

  June/July, 2008

6-9-2008 Dumpster inclosure behind building one.

 

  June/July, 2008

6-12-2008 Duct and curb for exhaust fan.

 

  June/July, 2008

6-18-2008 Dens Glass on the back side of building one.

 

  June/July, 2008

6-18-2008 Finish plywood on building two.

 

  June/July, 2008

6-19-2008 Exterior framing on building one.

 

  June/July, 2008

6-21-2008 Felt paper complete on building two.

 

  June/July, 2008

6-21-2008 Curbs for exhaust fans.

 

  June/July, 2008

6-21-2008 Dens glass and plywood complete on back side of building one.

 

  June/July, 2008

6-21-2008 Fire hydrant behind building two.

 

  June/July, 2008

6-27-2008 Blocking for restroom.

 

  June/July, 2008

6-30-2008 Conduit for TV and Phone.

 

  June/July, 2008

7-16-2008 Curb along the front of both building.

 

  June/July, 2008

7-22-2008 Box for fire alarm.

 
 