Pine Lakes Country Club

                Construction Progress Photos

 

                            June, 2008

 

  June, 2008

6-3-2008
New LVL in lobby.

 

  June, 2008

6-3-2008
Lobby to ballroom 2 opening.

 

  June, 2008

6-3-2008
Lobby- new beam.

 

  June, 2008

6-3-2008
Lobby beam.

 
 

  June, 2008

6-6-2008
2nd fl office wall- demo.

 

  June, 2008

6-6-2008
2nd fl office wall- load bearing.

 

  June, 2008

6-6-2008
2nd fl office wall.

 

  June, 2008

6-6-2008
Ballroom 2 opening- B&C want archway.

 

  June, 2008

6-6-2008
RW pub patio walls.

 

  June, 2008

6-9-2008
Gov suite framing.

 

  June, 2008

6-9-2008
Gov suite framing 2.

 

  June, 2008

6-9-2008
Library corner rotten sheathing.

 

  June, 2008

6-9-2008
Library rotten sheathing at bottom.

 

  June, 2008

6-9-2008
Library rotten sheathing at top.

 

  June, 2008

6-9-2008
Rotten sheathing at Library.

 

  June, 2008

6-9-2008
Service corridor ceiling.

 

  June, 2008

6-10-2007
Service corridor framing.

 

  June, 2008

6-10-2008
Ballroom bath floor & riser room.

 

  June, 2008

6-10-2008
Ballroom bathroom floor completed.

 

  June, 2008

6-10-2008
GS framing 1.

 

  June, 2008

6-10-2008
GS structural framing 2.

 

  June, 2008

6-10-2008
GS structural framing 3.

 

  June, 2008

6-10-2008
Library door closed in.

 

  June, 2008

6-10-2008
RW pub column block out.

 

  June, 2008

6-10-2008
RW pub patio grading.

 

  June, 2008

6-10-2008
Rear porch siding removal 1.

 

  June, 2008

6-10-2008
Rear porch siding removal 2.

 

  June, 2008

6-13-2008
Ballroom.JPG

 

  June, 2008

6-13-2008
Library 1.

 

  June, 2008

6-13-2008
Library 2.

 

  June, 2008

6-13-2008
Library 3.

 

  June, 2008

6-13-2008
Library 4.

 

  June, 2008

6-13-2008
Library 5.

 

  June, 2008

6-13-2008
Library ceiling framing.

 

  June, 2008

6-13-2008
Kitchen wall to be demoed.

 

  June, 2008

6-13-2008
Asbestos pipe behind door trim.

 

  June, 2008

6-17-2008
Gov suite floor.

 

  June, 2008

6-17-2008
Gov suite floor replacement.

 

  June, 2008

6-23-2008
Cart barn steel.

 

  June, 2008

6-23-2008
Cart barn steel erection.

 

  June, 2008

6-23-2008
HC ramp footing.

 

  June, 2008

6-23-2008
HC ramp wall forms.

 

  June, 2008

6-23-2008
Patio stair forming.

 

  June, 2008

6-23-2008
RW pub patio stair prep.

 

  June, 2008

6-23-2008
Rt side entry sheathing replacement.

 

  June, 2008

6-23-2008
Steel & metal framing.

 

  June, 2008

6-23-2008
Site sewer line.

 

  June, 2008

6-25-2008
Area at buried fuel tank.

 

  June, 2008

6-25-2008
Fuel tank removed.

 

  June, 2008

6-25-2008
Exterior sheathing & window prep.

 

  June, 2008

6-25-2008
Sheathing replacement.JPG

 

  June, 2008

6-27-2008 Cart Barn.

 

  June, 2008

6-27-2008
Cart Barn at end of kitchen- grade.

 

  June, 2008

6-27-2008
Steel beam at Cart Barn.

 

  June, 2008

6-27-2008
Ballroom plaster repair.

 

  June, 2008

6-27-2008
Framing tie in at existing.

 

  June, 2008

6-27-2008
Kitchen (rotted) wall at service yard.

 

  June, 2008

6-27-2008
Patio stair forming looking East.

 

  June, 2008

6-27-2008
New addition looking north.

 

  June, 2008

6-27-2008
North elevation.

 

  June, 2008

6-27-2008
South Elevation.

 

  June, 2008

6-30-2008
Replaced sheathing at service yard.

 

 

  June, 2008

6-30-2008
Corridor wall insulation installed.

 

  June, 2008

6-30-2008
Corner block wall at Cart Barn.

 

  June, 2008

6-30-2008
North side cart barn block wall.

 

  June, 2008

6-30-2008
West side of Cart Barn block wall.

 