Workshop Tools
Construction Progress Photos
April/May/June/July 2008
4-11-2008 East along Legends Drive.
4-11-2008 Site from 501.jpg
4-11-2008 West to East.
4-11-2008 North silt fence.
4-11-2008 Construction haul road.
4-30-2008 E to W chambers at CB 2.
5-23-2008 Bldg B column line 2.
5-23-2008 SD at entrance.
6-6-2008 Bldg A footings on K line.
6-6-2008 Bldg B piers on D line.
Building B erection.
Building A West elevation.
Building A East elevation.
Elevation from 501.
Rear elevation of buildings.
Girts on Bldg A - ready for wall panels.JPG
Stone veneer and storefront - back side of Bldg A.
Stone veneer wrapped column.
Tower Steel.
Wall panels complete on side of bldg B.
Lodge sheetrock - hung and finished.