Woodhouse Day Spa
Phases I and II
Mount Pleasant • South Carolina
This project was organized into two phases – Phase I included the interior demolition of the existing building located at 725 Johnnie Dodds Boulevard; Phase II was comprised of the upfit to the space.

Phase I included: removal of interior walls and partitions, flooring; HVAC ductwork and equipment, and abandonment of a grease trap. Flashing and patching of the existing roof was conducted where HVAC roof top units were removed.

Phase II included: metal stud framing, drywall and acoustical ceiling assemblies; new doors, frames, and hardware, amtico flooring, and hard tile; new plumbing, electrical distribution, reconfiguration of existing HVAC ductwork for new distribution; and modification of the existing aluminum storefronts.

GREENVILLE   ::   COLUMBIA   ::   CHARLESTON   ::   MYRTLE BEACH

Mashburn Construction