Mercedes-Benz Canteen
Ladson, SC
This project includes the renovation of approximately 11,600 SF of garage space in the administration building, which was converted into a full-service cafeteria. Our design-build team worked through value engineering to deliver the project on a tight budget. The space was designed to seat over 200 occupants. Food service equipment was carefully coordinated to meet design requirements. Mechanical systems were designed to maximize the acoustical potential for conversations and minimize the sound of machinery. This included the use of K-13, a spray foam sound attenuating insulation at the ceiling, as well as strategic locations of Mechanical equipment on the roof to keep units above the kitchen area and to minimize noise in the seating area.