Project Ruby (Flex)

West Columbia, SC

Mashburn worked with the end-user and the client to deliver the project using CM at-Risk methodology. Plans were being drawn-up until the last day which changed production lines and space. The equipment that the end-user needed was being shipped from countries outside of the United States. Mashburn worked closely with Lexington County for three permits per phase of the project. Another challenge Mashburn faced was the installation of 150,000 SF medical-grade clean room into a 250,000 SF existing facility. It was discovered that the existing facility structure was not adequate for the clean room’s needs and required the addition of supporting steel. Flex, Project Ruby, was composed of multiple phases of design and production which required multiple teams working together on a tight timeline. Mashburn also upfitted several million dollars worth of office space.

  • Location

    West Columbia, SC
  • Completion Date

    August 2019
  • Size

    250,000 SF